Original old petroleum trade magazine vintage article featuring the DIXIE PIPELINE COMPANY. Weather, terrain, and hurricane overcome in completing 1080 mile Dixie pipe line on schedule, by John P. O'Donnell. When construction of the LPG line from Mont Belvieu, Texas to Raleigh, NC began, it was generally agreed that it would be a tough job. After Hurricane Carla hit and the summer turned out to be the South's rainiest in half a century, any remaining doubts were removed. Shown are L.E. Anderson, constructino manager for the east, and M.S. Wharry, chief inspector for Spread. Also pictured is the bit used on the Mississippi River crossing with Willie Prather, Service Pipe Line Company inspector on the West Segment. This 1962 six page gatefold oil and gas industry article would be a nice addition to your collection.
- SKU zc007
Payment Methods
Shipping
USPS, FREE Shipping
Payment Policy
We accept major credit cards and PayPal.
Payment is due upon checkout..
Shipping Policy
Free Shipping. USPS First Class with Delivery Confirmation
All ads, catalogs, and maps are stored and shipped in an acid-free PVC sleeve with a stiff acid-free white backboard. Items are always stored and shipped flat, never rolled, folded or shipped in tubes.
Mailers are stamped ((( PHOTOS - DO NOT BEND ))).
We only ship to your 'confirmed' Paypal address.
All shipments will have USPS tracking information available via email and online.
We package all items for safe and secure arrival.
Domestic USA Shipping Only.
Sorry, No International Shipping at this time..
Return/Exchange Policy
Returns Not Accepted, unless grossly misrepresented.
Other Policies
Open 24 / 7
Please Login or Register first before asking a question.